Brownieleys is a three turbine cluster near Fordoun, Laurencekirk. Enercon E-82 2.35MW Turbines are featured and the site became operational in February 2017. Brownieleys features a complex Transmission Grid Intertrip, to ensure compliance with wider transmission restraints. Brownieleys is a joint venture between Muirden Energy and the landowner, and was managed by Project Engineer Ewan Eley.

Where possible Muirden Energy endeavours to support local contractors. At this site, Geddes Contractors undertook the access and civils, with Bryan J Rendall (Electrical) Ltd undertaking the Electrical Balance of Plant on the Wind Farm.