Braeside is a single Enercon E-48 site located near Fordyce, Aberdeenshire. The turbine became operational on 23rd September 2016. Total construction time was 6 months and managed by our Project Manager Chris Dall.

Where possible, Muirden Energy endeavours to support the local economy at our turbine sites by using locally sourced contractors. At this site Davidson Plant Hire was the civils contractor, McKenzie Electrical Solutions as the electricals contractor and Seivwrights Bros Ltd carried out all of the offsite roadworks.