Strath of Brydock
Strath_of_Brydock.jpg
Strath of Brydock

Strath of Brydock is a cluster of three Enercon E-70s (2.3MW) located near Banff, Aberdeenshire. The site became operational in 2009 and was later sold to Resonance Asset Management on 16th April 2013.

Where possible, Muirden Energy endeavours to support the local economy at our turbine sites by using locally sourced contractors. Davidson Plant Hire, based at Turriff, completed the crane hardstanding and road improvements, with concrete supplied by Lovie Ltd. Greencat, of Oldmeldrum, provided consultancy and site supervision.