Wrae is a single Enercon E-48 site located near Turriff, Aberdeenshire. The turbine became operational on 22nd September 2015 and was managed by our Project Engineer Aidan O’Mahony. Wrae is a joint venture between Muirden Energy and Wrae Farm owner, Sandy Norrie.

Where possible, Muirden Energy endeavours to support the local economy at our turbine sites by using locally sourced contractors. At this site Davidson Plant Hire was the civils contractor with Bryan J Rendall (Electrical) Ltd as the electricals contractor.